Home » FAQ

Products

Road Maintenance

Superior Cold Mix Asphalt

Micro-Paving Cold Mix Asphalt

Pourable Crack Filler

Adhesive Crack Tape

Elastic Crack Tape

Instant Concrete Repair

Asphalt Pavement Sealer

Colored Asphalt

Cold Mix Color Asphalt

Warm Mix Colored Asphalt

Colorless Asphalt Binder

Color Porous Asphalt Pavement

Color Asphalt Pigment

Construction Material

Geogrid

Geotextile

Geomembrane

Asphalt Emulsion & Additives

Porous Asphalt Modifier

Cold Mix Asphalt Emulsion

Asphalt Recycling Agent

SBS Latex

Others

Cold Asphalt Mixing Plant

FAQ

How to use?


Potholes Repair

It is so simple anyone can do it

Step 1. Clean the hole of loose debris.

Step 2. Pour out the contents of the bag or bucket.

Step 3. Compact with tamper, shovel or even a car type.

Step 4. Accept traffic immediately.


Quick Tip:

1. If the pothole is full of water, Go Green cold patch can be placed without removing the water and the material will still compact, bond, and provide adequate performance. Go Green is designed for " throw and go" appllications to be left for traffic to provide compaction.

2. Avoid dry turning tires on patched area for at least 24 hours (longer in cold weather).

Cold Asphalt Website
Home | Cold Mix Asphalt | Driveway Maintenance | Terms | Privacy Policy | Trademark | GOOGLE+
Video Center | Technical Info | Become a Producer | News | Locate Distributors
Copyright © 2009 - 2017 Go Green Industrial (Shanghai) Co.,Ltd. All Rights Reserved.
沪ICP备17008753号