Home » Technical Info » User Guide

Technical Info

User Guide

Technical Data & MSDS

Certificate

Quality Control

User Guide

Go Green Cold Mix Asphalt

Step 1 Clear
Sweep the base of the pothole of any loose debris by sweeping or raking. Ensure that no large loose rocks are present in the pothole before pothole repair step 2.
 
Step 2 Pour
Fill the pothole with Go Green Cold Asphalt Patch. Recommended compacted depth is 50mm. If area is deeper than 50mm, compact in layers (no deeper than 50mm per layer).
 
Step 3 Tamp
When hole is filled, apply a small crown to repair area to allow for additional compaction. Now tamp, or wheel roll for the final time , and you may now open to traffic – immediately!! It’s that simple. 

» Back

Cold Asphalt Website
Home | Cold Mix Asphalt | Driveway Maintenance | Terms | Privacy Policy | Trademark | GOOGLE+ | Sitemap | Package
Video Center | Technical Info | Become a Producer | News | Locate Distributors
Copyright © 2005 - 2013 Go Green Industrial (Shanghai) Co.,Ltd. All Rights Reserved.